A Step-by-Step Guide to Setting Up a Tub

Give Me A Quote!

The content down below relating to Tools You Need to Install a New Bathtub is definitely fascinating. Don't bypass it.


Installing A Bathtub
Setting up a bath tub isn't specifically brain surgery, however it does need strong plumbing, woodworking, and also often, tiling abilities. Changing an old bath tub with a brand-new one is also a reasonably hard job. If the old bathtub is conveniently obtainable, the task can relocate easily; if you need to open up a wall surface to get rid of the old bathtub as well as position the new tub, the task is much harder. In either case, the task is within a residence handyman's abilities, although you will certainly require an assistant to leave the old bathtub and also embeded in the brand-new one. Make certain you have actually certified yourself for the task and are comfortable attempting it. Rather than hiring a professional to take over a halfway-completed task, it is far better to take into consideration utilizing one before you begin. Opportunities are you might need a professional plumber to make tube links.
This post will assist you set up a new bath tub in your shower room if you have currently gotten a brand-new bathtub as well as don't need to transform the arrangement of your previous water pipelines.
Your tools and product list ought to comprise the following:
  • New Bathtub
  • Hammer

  • Pipeline Wrenches

  • Prybar

  • Safety Glasses

  • Degree

  • Pliers

  • Flexible Wrench

  • Putty Blade

  • Screwdriver

  • Cold Blade

  • Tape Measure

  • Pipeline Caps


  • Planning for the Installation


    To start with, the sustaining framework supplied with the bathroom ought to be fitted (if required) according to the supplier's directions. Next, fit the faucets or mixer to the tub. When fitting the faucet block, it is very important to make sure that if the tap features a plastic washing machine, it is fitted between the bathroom as well as the taps. On a plastic bath, it is additionally practical to fit a supporting plate under the faucets unit to stop stress on the tub.
    Fit the versatile tap adapters to the bottom of both taps utilizing 2 nuts and also olives (in some cases provided with the bathtub). Fit the plug-hole outlet by smearing mastic filler round the sink electrical outlet opening, and after that pass the outlet via the hole in the bath. Make use of the nut provided by the supplier to fit the plug-hole. Analyze the plug-hole outlet for an inlet on the side for the overflow pipe.
    Next, fit completion of the flexible overflow pipeline to the overflow electrical outlet. After that, screw the pipeline to the overflow face which must be fitted inside the bath. Make certain you use every one of the supplied washers.
    Attach the trap to the bottom of the waste electrical outlet on the tub by winding the thread of the waste electrical outlet with silicone mastic or PTFE tape, and screw on the catch to the outlet. Attach all-time low of the overflow tube in a similar manner.The bath must now prepare to be fitted in its last position.

    Removing Old Touches


    If you need to change old taps with brand-new ones as a part of your installment, then the first thing you need to do is detach the water. After doing so, turn on the taps to drain pipes any type of water continuing to be in the system. The process of removing the existing faucets can be quite troublesome as a result of the restricted gain access to that is frequently the case.
    Utilize a container wrench (crowsfoot spanner) or a tap device to undo the nut that links the supply pipelines to the taps. Have a towel prepared for the remaining water that will originate from the pipes. When the supply pipelines have been eliminated, make use of the same device to loosen up the nut that holds the taps onto the bath/basin. You will certainly need to quit the single taps from transforming throughout this process. When the faucets have been eliminated, the holes in the bath/basin will certainly have to be cleaned up of any kind of old sealing substance.
    Before proceeding to fit the brand-new faucets, compare the pipe links on the old taps to the new faucets. If the old faucets are longer than the new faucets, then a shank adapter is required for the brand-new faucets to fit.

    Mounting the Bath tub


    Using the two wood boards under its feet, position the bathtub in the required setting. The wooden boards are practical in equally spreading the weight of the bathtub over the area of the boards rather than concentrating all the weight onto 4 tiny factors.
    The following objective is to make certain that the bath tub is leveled all round. This can be accomplished by inspecting the level as well as changing the feet on the tub up until the level reads level.
    To mount faucets, fit all-time low of the furthest flexible faucet port to the suitable supply pipe by making a compression join; after that do the exact same for the other faucet.
    Activate the water supply and check all joints and new pipework for leakages and also tighten them if essential. Load the bath tub as well as additionally examine the overflow outlet and the regular outlet for leakages.
    Lastly, fix the bath paneling as defined in the maker's instruction manual. Tiling and also sealing around the bathtub needs to wait up until the bath tub has been made use of at the very least when as this will resolve it into its final position.

    Fitting New Touches


    If the tails of the brand-new taps are plastic, after that you will need a plastic adapter to stop damage to the thread. One end of the port fits on the plastic tail of the tap and also the various other end offers a connection to the current supply pipes.
    If you require to fit a monobloc, after that you will call for minimizing couplers, which links the 10mm pipe of the monobloc to the typical 15mm supply pipeline.
    Next, position the faucet in the installing hole in the bath/basin making certain that the washers remain in location between the faucet as well as the sink. Secure the tap in position with the producer provided backnut. As soon as the tap is securely in position, the supply pipes can be attached to the tails of the taps. The faucets can either be linked by using corrugated copper piping or with regular faucet ports. The previous type should be linked to the tap finishes first, tightening just by hand. The supply pipes can later on be connected to the other end. Tighten both ends with a spanner after both ends have actually been connected.

    Tiling Around the Tub


    In the location where the bath satisfies the tile, it is necessary to seal the accompanies a silicone rubber caulking. This is necessary as the fitting can move sufficient to split an inflexible seal, triggering the water to pass through the wall between the bathroom and also the tiling, causing complications with moisture and also possible leaks to the ceiling listed below.
    You can pick from a variety of coloured sealants to assimilate your components and fittings. They are marketed in tubes as well as cartridges, and also are capable of securing spaces approximately a width of 3mm (1/8 inch). If you have a bigger void to fill, you can load it with twists of drenched paper or soft rope. Keep in mind to constantly load the tub with water prior to sealing, to permit the movement experienced when the bathtub is in usage. The sealer can break rather early if you do not think about this movement prior to securing.
    Additionally, ceramic coving or quadrant ceramic tiles can be made use of to edge the bathroom or shower tray. Plastic strips of coving, which are easy to use and reduce to size, are additionally easily offered on the marketplace. It is advisable to fit the tiles utilizing waterproof or waterproof sticky and also cement.

    A Step-by-Step Guide to Installing a Bathtub


    Is your bathtub looking a bit dated lately? Believe it or not, installing a new one is a project you can do yourself. Whether your bathtub is broken or doesn’t fit in with your current bathroom’s design, you can fix it without having to hire a contractor or paying labour costs.



    But, beyond saving money, there are other benefits of installing your own bathtub. When you do this project yourself, you can customise every step of the process. You can also make sure the finished product looks exactly the way you want it to.



    This DIY project is quite involved, but by doing some research, preparing your bathroom and using the right equipment, it is definitely one you can take on. This guide will help you understand the technical procedures behind installing a new bathtub.


    Remove the Existing Bathtub


    To remove the old bathtub, you will need to turn the water supply off before you start any work. After you turn the water off, there will likely still be some water left in your plumbing system, which you can remove by turning on a faucet below the level of the bathtub. Once the water stops running, you are ready to start working.



    The easiest way to remove the tub is to remove the faucet, handles and other piping and then pull the tub out from the wall. If this doesn’t work in your situation, you will need to remove part of the wall, remove the piping and then slide the tub out.


    Choose the Right Bathtub


    The ideal way to replace your bathtub is to find one that has the exact dimensions and has the drain and faucet on the same side as your old one. This way, it will fit in the same place and you won’t have to change the piping system in your bathroom. Choose a tub that matches your home’s decor and fits with the style of the bathroom.


    Install the Plumbing and Ledger Board


    You can purchase a tub drain kit at a hardware store which will have all the pieces you will need for your new tub’s plumbing. Follow the instructions that came with the kit to install the plumbing in the new tub and then take measurements to make sure the plumbing in the tub will align with the plumbing in your bathroom. If it doesn’t, now is the time to make necessary adjustments.



    Some bathtubs need a ledger board that is installed on the wall behind the tub to help support it. If your new bathtub requires one, the directions that came with it will tell you how high it should be installed. If your old bathtub had a ledger board, and it is still in good condition, you can adjust its height to match the new bathtub.


    Install the Bathtub


    When the plumbing and ledger board are ready, you can install the new bathtub. Carefully lower it into the space, being careful not to damage the tub, wall, plumbing or ledger board. Since bathtubs are very heavy and you will need to line the tub up exactly, it is wise to have someone help you with this step.



    Once the tub is in place, it needs to be perfectly level, so use a bubble level instead of estimating how level the tub is. Put the level on the top edge of the tub, not the bottom on the inside, since many tubs are designed with a sloped bottom.



    If the bathtub isn’t level, adjust the ledger board and shift the tub until it is. When it is level, use screws to attach the tub to the wall studs. Most bathtubs have pre-drilled holes in the upper flange, so use these but do not over tighten the screws.


    Hook up the Plumbing


    Now that the bathtub is installed, it needs to be attached to your plumbing system. First, install the shoe fitting under the tub and drain pipe, then the overflow pipe and then the drain flange. Your tub plumbing kit will include specific instructions on how to install these pieces.


    Install the Bathtub Surround


    A bathtub surround will protect the walls around the tub from water damage and can give your new bathtub a more finished look. To install one, make sure the wall is completely clean and dry so that the adhesive will be able to hold the surround securely. Then, measure the surround and mark the same dimensions on the wall above the tub.



    Following the directions that came with the surround adhesive, apply it to the wall. Press the surround against the wall on top of the adhesive and then pull it away for about three minutes to activate the adhesive, then apply the surround again. Keep in mind that this is the most common way to use an adhesive, but you should check the instructions on the package for any special steps.



    If there is any excessive adhesive around the sides of the surround, you can use mineral spirits to remove it. Then use masking tape to hold the surround panels in place until the adhesive is dry. Using silicone, seal all the cracks between the surround panels and the gap between the bottom of the panels and the top of the bathtub.



    If you want to install tile above your bathtub, instead of a bathtub surround, the process will be very similar. But, you will need to measure and cut tiles and install each one individually, using tile spacers to make sure they are evenly spaced. You will then use grout to fill in the spaces between the tiles.

    https://www.hss.com/blog/bathroom/a-step-by-step-guide-to-installing-a-bathtub/


    Tools You Need to Install a New Bathtub

    Hopefully you enjoyed reading our post about A Step-by-Step Guide to Installing a Bathtub. Thanks a ton for taking time to browse our blog. Enjoyed reading our piece of writing? Please share it. Let other people locate it. I take joy in reading our article about How to Install a Bathtub.




    Book Now!


    Leave a Reply

    Your email address will not be published. Required fields are marked *